This Y-splitter is used to connect a mobile phone or laptop to active speakers when they are further apart. The stereo signal is split into two mono channels so that they can be mixed separately. Both channels are colour-coded.
The high-quality metal REAN® by NEUTRIK® connectors can be unscrewed and are protected against damage by a kink protection. The contacts are gold-plated to prevent corrosion.
The conductor area of 0.22 mm² and a braided shield of bare copper wires ensure loss-free transmission. The length of the cable before splitting is approx. 15 cm and it is protected from damage by a strain-relieving fixation.
Length: 3m